Friday 21 July 2017

July 2017 Update

Making good and steady progress on some of the boards..
Ted on board 5 has now really got the impression we wanted of an industrial area before the mainline railway goes off scene, also the high embankment walling and tunnel to the branch line exit track. There are sidings at both sides of the mainline to service the industries.


Here is a closeup of the work Ted has done on the buildings.


The work on the station area continues, Kevin 3, Richard and Steve C have concentrated on the platforms and provisional area for the actual station building. Passenger bridges will be added and also later a goods yard with associated buildings. The town bridge parapet can be seen in the foreground.


This shot shows the view as we consider the placement of the detailed front of the bridge section. There are two mainline tracks between the platforms, a single DMU/EMU track this side of the platform and the line nearest is the goods track leading off scene to the quayside.


Watch out for further postings...