Wednesday, 23 August 2017

August 2017 Update

Here is a snapshot of our progress on the new 00 layout as at August 2017


Work on board 1 - the Poole road bridge is secured in place with the viewing side Skytrex arches, thanks to Geoff for help on this. The station building is approx 75% complete. Richard is working on the platform passenger bridge which needs adapting as it is too high as it stands. Kevin L has done great work on the platforms, the main areas are almost complete now we need to work on the surface around the main station buldings and under the bridge area.


 Kerry's board 2 has now had the base layer of embankment grasses added and Kerry is near completing the mock Holes Bay shoreline. More detail is to be added like fencing and work on the footpath as well as considering the scenery in the middle trackwork area.


Steve Cope is developing board 3 with an area of railway ditritous, pools and piles of waste materials that was ofeten seen railside. He is also building the main signal box which will appear near the toilet roll soon! Contributions of old wheel sets, bits of rail and cable drums very welcome!


 Kevin M is working on board 4 and experimenting with different ground cover to establish a common scatter materails as well as bushes, trees etc. The front edge of this board as with board 3 will have a small embankment with groundcover.


Ted on baord 5 has moved on from the main factory buildings to start ground cover and walling near trackside.


Kevin with help has almost completed the "joining board" with two levels. Top level links the double mainline from board 5 to the sector plate and the lower level seen here is the branchline which will host DMU/EMU's etc this terminates at the lower right of the picture.


 The "rotating sector plate" which contains 10 storage tracks, is nearing completion with Kevin M, Ian, Ted and others all adding their help. Electrics are now been added and tested. Once comlpete we just have to build yet another! at the other end of the layout!!

More  work in August is planned to add the front facia boards and also the backscene boards - keep watching!